Skip to main content
logo logo

|   Help center

Visit our website Submit a request Sign in
What can we help you with?
  1. Detector Inspector
  2. Services & further works
  3. Fact sheets & information sheets

Fact sheets & information sheets

  • Information Sheet: Pressure Temperature Relief Valve/Line
  • Information Sheet: Testing A Gas Line For Pressure Retention
  • Ingress Protection (IP) Rating Failure
  • Insulation Resistance Failure - AS/NZS 3019:2007
  • LED Light fittings
  • Location of switchboards & Obstructions
  • Main Earth Labelling
  • Main Earthing - Main Earth & Neutral Link missing
  • Main Earthing System Compliance - AS/NZS 3019:2007
  • Manual Damper Installed To Flue System
  • Minimum Flue Clearances From Combustible Surfaces
  • Minimum Flue Clearances From Roof Line
  • Minimum Single Skin Flue Clearances From Combustible Surfaces
  • Non Compliant Electrical Installation - AS/NZS 3019:2007
  • Plastic Pex Pipe Used At Connections Of Water Heater
  • Prohibited Locations- Instantaneous Water Heaters
  • RCD / RCBO testing
  • Recall - Rinnai 556 - Poor Gasket Seal
  • Resistance & Continuity of the earthing system
  • Rheem Pronto Flue Clearances
  • Rinnai Energy Saver Power Supply Requirements
  • Rinnai Energy Saver Space Heater Clearances
  • Rinnai Instant Hot Water Forward-facing Obstruction Clearance
  • Rinnai Open Flue Minimum Clearances
  • Rinnai Open Flue Seal Against Chimney
  • Rinnai Open Flue Space Heater Power Requirement
  • Rinnai Open Flue Space Heater- Cowl Requirements
  • Rinnai Space Heater Flue Terminal Secure
  • Rinnai Space Heater Supports
  • Risks of damaged plugs and cords
  • « First
  • ‹ Previous
  • Next ›
  • Last »
Can't find what you're looking for?
Let us help you right now!
Submit a request
1300 134 563
Book a service
Get in touch
  • © 2022 Detector Inspector
  • Info Sec Policy
  • Privacy Policy
  • Insurance Policy
  • Terms of Service
  • Electrical Licenses: VIC 30673 | QLD 87100 | NSW 372889C | TAS 15608738